# Ureuk Bridge: optional exterior-profile refinement US01

**Scope:** photo-guided structural silhouette study, not a survey, certified structural model, or whole-city revision. R1 and R2 are not modified. This package changes actual bridge meshes, not the Site styling or decorative-object count.

## What was verified from the reference

The original photographer's [10 December 2024 page](https://photoseoul.tistory.com/558210) was inspected through the full-resolution daylight overall, pier close-up and approach photographs. The close-up contains **Ureuk Bridge in front** and **Tangeum Bridge's ripple arches behind**. They are different bridges. Ureuk is a low-pylon extradosed bridge, not an arch.

Visible evidence in the Ureuk close-up:

- The short, rectangular upper pylons continue into broadly curved, outward-splayed lower legs. The paired lower legs remain separate; the opening is not filled with a central solid pier.
- A transverse member bridges the legs below the deck. Its lower edge has a shallow upward curve near its middle.
- The deck's outer edge is relatively thin, with visible cantilevered overhang and a recessed/sloping underside. It does not read as a full-width rectangular block with a tall vertical outside face.
- The shallow straight stays already present in R1 are retained. No new stays are claimed.

Reference photos are copyrighted internal inspection material. They are **not included in this package, embedded in the blend, used as textures, or included in publication-safe comparisons**. The internal-only comparison HTML refers to the existing local reference files rather than copying their pixels.

## Baseline actually inspected

Input: `Chungju_Refinement_R1/Chungju_Refinement_R1.blend`

SHA-256: `c6a6c1483c296000efc8877d87612299c90193ab2330c0326bb46f77f58b01e5`

Objects were selectively appended using `bpy.data.libraries.load`, without opening the whole-city scene. The study includes the actual Ureuk meshes, the neighboring Tangeum meshes, mapped-water collection and source light/world. It is an extracted study, not a replacement whole-city file.

R1 already contains 12 pylon/leg objects at six stations, six transverse heads, a single deck, 144 stays, anchor blocks, and V07 sleeves/eave profiles/rails. The pylon/leg outlines have only 12 profile vertices, giving abrupt angular bends. The baseline deck has a full-width rectangular section at each chainage, despite its existing longitudinal depth variation. These are the most consequential visible mismatches addressed here.

## Bounded changes

1. Replace each pylon/leg exterior with a sampled cubic sweep between its **exact existing base/onset and upper cap endpoints**. Straight bases, cap tops, pylon thickness and placement are preserved. The curves have vertical tangents at the transition endpoints.
2. Replace each transverse head's flat soffit with a shallow curved soffit, keeping the top face, attachment elevations, end corners and longitudinal thickness. The estimated middle rise is 0.65 m within the original bounding height.
3. Replace the deck's vertical outer slab sides with a thin fascia, cantilever shoulder and inset sloping web. All 414 original top-edge coordinates, all source chainages, all original top elevations, and the original center soffit elevation at every chainage are preserved. Original transverse width and longitudinal depth envelope remain.

The modeling parameters in `PARAMETERS` are estimates: 0.55 m edge fascia, 2.85 m shoulder inset, 5.10 m lower-web inset, the 0.65 m head-soffit rise and the curve handles/sampling. They were chosen for a bounded visual correction from photos, not extracted as measured dimensions. No assertion about hidden cells, tendons, bearings, reinforcement, load paths or structural adequacy is made.

## Inventory dimensions versus estimates

The [CODIL inventory PDF](https://www.codil.or.kr/filebank/original/EC/OTKCEC200772/OTKCEC200772.pdf) is an inherited dimensional source: 795.6 m length, 26.2 m width, 7 spans, maximum 125 m, EXT. Those values were documented in the source model's report; this patch does not claim to have newly measured the PDF drawing. Earlier reports record conflicting construction-source dimensions, which this patch does not resolve.

The original model uses 5 internal spans of 125 m and equal end spans of 85.3 m. **85.3 m is a modeling reconstruction, not a verified as-built end-span length.** Source deck elevations, camber, pylon protrusion, footing levels, member sizes and approach earthworks remain approximate. The patch leaves these dimensions and all geographic coordinates in place.

## Reversible source retention and export safety

Nineteen original objects are retained with unmodified meshes, UVs, materials and transforms in:

`US01 | Original source geometry - not in scene`

That collection is unlinked from every scene and has `use_fake_user=True`, preserving it when the blend is saved. Each archived object is marked `_us01_archived_source=True`, `hide_render=True`, and `hide_viewport=True`. `_us01_restore` stores the exact original collection links and visibility flags. Merely hiding originals would not be sufficient for custom exporters.

Use the callable `is_exportable(object, scene=None)` even if an exporter iterates `bpy.data.objects`. It explicitly rejects the archive tag, archive collection, hidden-render objects, and objects outside scenes. The active replacements are in:

`US01 | Ureuk photo-guided exterior profiles`

Each replacement has `patch_id='US01'`, `source_object`, `source_photo`, `accuracy`, and `publication` properties. The source collection has a JSON `parameters` property. The archive's `export_policy` property says it must not be linked or exported. `restore_patch()` removes the generated collection and returns exact source objects to their recorded collections and visibility.

## Apply, test, and restore

Within Blender's Python session, load `patch_ureuk_structure.py` as a module and call `apply_patch()`. It does not save files. Save the result to a **new** output name after checking QA. Do not overwrite R1/R2 and do not replace the whole-city model with this extracted study.

For an isolated reproduction, run from the recovered project root:

    blender -b -t 2 --python audit/ureuk_structure_detail/extract_study.py
    blender -b audit/ureuk_structure_detail/Ureuk_before_extracted.blend -t 2 --python audit/ureuk_structure_detail/test_patch.py

To roll back in the current Blender scene, import the same module and call `restore_patch()`. Calling `apply_patch()` again is also safe: it restores its old version before applying the current patch.

`test_patch.py` verifies original geometry/UV/material/coordinate fingerprints, all source material datablocks, unaffected collection membership and visibility, exact deck-top and cap coordinates, idempotence, closed outward meshes, finite coordinates, nondegenerate faces, no noncontiguous edges, exact restore, and archive export exclusion. `structure_patch_qa.json` is the machine-readable result. `verify_reopened.py` additionally checks source retention/export safety after reopening the saved output.

## Renders and limits

The `profile_underdeck_before/after.png`, `profile_waterline_before/after.png`, and `profile_cross_section_before/after.png` pairs use identical cameras, resolution, light and render settings within each pair. They are actual Blender Workbench renders with controlled single-color shading, not generated illustrations. This isolates shape changes and does not claim a material/lighting upgrade. The camera poses are diagnostic comparisons, not calibrated reconstructions of the photographer's viewpoint. The `cross_section` filename denotes an end-on view along the bridge, not a cut section or as-built drawing; farther stations remain visible. The after-study has one extra inspection camera and a framed viewport for usability; the callable geometry patch creates no camera. The final profile renders hide surrounding objects to avoid presenting incomplete riverbank context as finished. Earlier Cycles context diagnostics are not the publication comparison. The actual mapped-water and neighboring bridge objects remain in the extracted input/output and are untouched by the patch. No material/UV changes are included in the patch.

These profile improvements do not establish survey fidelity. Exact section dimensions, pylon lateral relationship to the deck, weathering, deck services, underside details, approach landforms and bank context still require better calibrated references/drawings. Existing V07 decorative details are left as-is and are not counted as new work.
